Zhang Zhiyang is the group leader of the prequalification Review Committee for
In 2024, the Construction and Public Works Department of Longgang District of Shenzhen, in collaboration with the functional departments of the district, will continue to launch the "sustainable Growth" of Longgang high-quality campus construction "City Master Plan", which is sustainable, low-carbon and local growth. Continuing the word "growth" of "Zhiyou growth" in the last season, this paper further studies how to reshape the relationship between the surrounding environment and the campus in the limited urban stock space, pay attention to the regionality, reserve moderate flexibility, and interact with the vitality of the community, so as to realize the sustainable construction of high-quality campus environment. The report to the 20th National Congress of the CPC mentioned that "we adhere to sustainable development, adhere to the principle of saving first, protection first, and natural restoration first, protect nature and the ecological environment like protecting our eyes, unswervingly follow the path of civilized development of production development, rich life and good ecology, and realize the sustainable development of the Chinese nation." In this context, the design tender for the new project of Fengan nine-year unified school in Pinghu Street will be officially launched as the first batch of projects of Longgang high-quality campus "sustainable growth" in 2024.
The prequalification meeting for the design of the New project of Fengan nine-year School in Pinghu Street was held in Longgang District, Shenzhen, Guangdong Province on March 19, 2024. The prequalification review committee is composed of 7 architectural experts from Beijing, Shanghai, Shenzhen, Hong Kong and Changsha, all of whom have rich design experience and deep insights in the field of school architecture. After fully understanding the project background and design points, the prequalification review committee conducted a fair, just and careful review of 92 valid prequalification results. The evaluation committee adopts the method of registered voting and round by round voting. After careful comparison and full discussion of the result documents, a total of 6 rounds of voting are selected, and 5 pre-qualified finalists (without ranking) and 2 candidate units (with ranking) are finally selected.

  • INGAME
  • PROJECT
  • OFFICE
  • MEDIA
  • JOBS
  • CONTACT